Tuesday, April 28, 2015

No Walls Yet

Not much progress, except that they filled in gravel, getting ready for the walls/basement slab to be poured.  PM said the basement wall guys are backlogged, but should pour the walls sometime this week.  Here are some pictures of today's site visit:

Left front of house - (The walls will sit on top of the poured concrete footer)

Left rear of house - (The white pipe with cap is for Radon)

Right rear of house - (The rectangular pieces inside the perimeter are supports for the house columns)

Right front of house (There should be 4" of gravel underneath the basement slab)

I also found out, much to my dismay, that the electrical boxes will be in the front of the lots, not the rear like the other phase.  See the orange conduits poking through?  That is where the green electrical transformer will go.  Fortunately, it's on the left side of my driveway, near the lot line.

Also, see the light green PVC tubing near the curb?  It has my house plans.  Wonder if anyone will miss it for an hour while I make copies?...




2 comments:

  1. Lol, take those plans and make copies as fast as you, if you do it in the middle of the night they for sure won't miss them, just have them back before the sun comes up just in case. I feel like they should just give us copies.

    ReplyDelete